Monday, March 30, 2009
Peaks on Main Part of Phase 2
Pics and report by Prof. Ron Roehl:
They put the peaks on today on the largest part of phase 2.
The perspective pics you will see show how large this section really is. There are a lot of different purpose rooms in this section including the library.
.
They put the peaks on today on the largest part of phase 2.
The perspective pics you will see show how large this section really is. There are a lot of different purpose rooms in this section including the library.
.
Labels:
pics
Saturday, March 28, 2009
Rafters for Phase 2
Pics submitted by Prof. Ron Roehl and Cheryl Meyer:
Report by Prof. Ron Roehl:
Some pics from early in the week.
Outside scenes to show the week's progress and the unfinished rafters on this section. They each need a peak yet also.
Inside pics will give an idea of the size of the area.
Door frames waiting to be put in.
Practice room shots inside the music/shelter room.
.
Report by Prof. Ron Roehl:
Some pics from early in the week.
Outside scenes to show the week's progress and the unfinished rafters on this section. They each need a peak yet also.
Inside pics will give an idea of the size of the area.
Door frames waiting to be put in.
Practice room shots inside the music/shelter room.
.
Labels:
pics
Thursday, March 19, 2009
Rafters Ready
Pics and report by Prof. Ron Roehl:
Worked mostly on the ground today getting rafters etc. ready to go up. Tomorrow should see some go up.
Grouting for the tile is finished in the Science rooms and looks real nice.
.
Worked mostly on the ground today getting rafters etc. ready to go up. Tomorrow should see some go up.
Grouting for the tile is finished in the Science rooms and looks real nice.
.
Labels:
pics
Wednesday, March 18, 2009
Walls Continue for Phase Two
Pics and report courtesy of Prof. Ron Roehl:
Tiling is about finished in the Physics/Chem room and the Biology room. It will take approximately a day to grout the rooms
A couple pics are from early this morn and of course some later.
The next area that will have a peak has been walled in as you can see.
A couple of perspective pics might help some of you.
.
Tiling is about finished in the Physics/Chem room and the Biology room. It will take approximately a day to grout the rooms
A couple pics are from early this morn and of course some later.
The next area that will have a peak has been walled in as you can see.
A couple of perspective pics might help some of you.
.
Labels:
pics
Tuesday, March 17, 2009
Walls Start Going Up for Phase Two
Pictures and report provided by Prof. Ron Roehl:
The boys are playing with their sticks today and when they finish it looks like a wall of phase 2.
Walls, then rafters and slab will come after that.
The tile looks great ...
One perspective shot from the path toward North Hall.
.
The boys are playing with their sticks today and when they finish it looks like a wall of phase 2.
Walls, then rafters and slab will come after that.
The tile looks great ...
One perspective shot from the path toward North Hall.
.
Labels:
pics
Monday, March 16, 2009
Footings and Tiling
Pics and report by Prof. Ron Roehl:
Deep footings ready for the walls on top with safety tips on top.
Forms in place and about ready for the pour.
Pouring done and finishing being done. It goes up from here.
Lab floors are getting the tiling done. They look great.
.
Deep footings ready for the walls on top with safety tips on top.
Forms in place and about ready for the pour.
Pouring done and finishing being done. It goes up from here.
Lab floors are getting the tiling done. They look great.
.
Labels:
pics
Friday, March 13, 2009
Friday, March 6, 2009
Reim Hall Slab, Tour Choir, Rafters
Pictures by Prof. Ron Roehl:
Outside work continues.
Reim slab being demolished. Monday will see the base sand come in and the footings dug. Then it is footings and go up from there. The weather does not look promising for good working conditions in the next weeks. Pray for better.
A look at a shelf in the Chem and Physical Science room.
Kind of dark but you can see the choir as it sang in chapel this morning. Millston on Sunday and tour the following week.
.
Outside work continues.
Reim slab being demolished. Monday will see the base sand come in and the footings dug. Then it is footings and go up from there. The weather does not look promising for good working conditions in the next weeks. Pray for better.
A look at a shelf in the Chem and Physical Science room.
Kind of dark but you can see the choir as it sang in chapel this morning. Millston on Sunday and tour the following week.
.
Labels:
pics
Thursday, March 5, 2009
Video: Reim Hall Demolition
Full Video of Reim Hall Demolition (Normal Speed):
http://www.ilcpublicity.org/video/reimhalldemoprojectnormalspeed.wmv
Video of Reim Hall Demolition (Faster Speed):
http://www.ilcpublicity.org/video/reimhalldemoprojectfast.wmv
http://www.ilcpublicity.org/video/reimhalldemoprojectnormalspeed.wmv
Video of Reim Hall Demolition (Faster Speed):
http://www.ilcpublicity.org/video/reimhalldemoprojectfast.wmv
Labels:
video
Reim Hall Demolition
Today Reim Hall was demolished, a building that served our church body well for many years. Certainly many memories were shared there by current and former students. We will try to compile some pictures and video of the activity. Please come back to this post if you wish to see what happened.
Labels:
pics
Wednesday, March 4, 2009
Rafters for Phase 2
Report and pics from Prof. Ron Roehl:
The long armed rafter setter is on site and phase 2 has begun in earnest.
Good planning has kept the building going even if the demolition of Reim was held off a couple days. Seems like tomorrow (Thursday) is D-Day.
First rafter up on Phase 2 and you were there.
By the end of the day there are many rafters up and bracing to keep them in place for the top rafters to sit on top. This is a very high peak.
These rafters cover the music room and the art room, I think.
.
The long armed rafter setter is on site and phase 2 has begun in earnest.
Good planning has kept the building going even if the demolition of Reim was held off a couple days. Seems like tomorrow (Thursday) is D-Day.
First rafter up on Phase 2 and you were there.
By the end of the day there are many rafters up and bracing to keep them in place for the top rafters to sit on top. This is a very high peak.
These rafters cover the music room and the art room, I think.
.
Labels:
pics
Monday, March 2, 2009
Phones, Phase 2 Walls
Inside Prof. Roehl and Brian Lillo working on the installation and hookup of phones for each room. They will serve as intercom and outside lines if needed.
Outside work is beginning on the Phase 2 East walls.
.
Outside work is beginning on the Phase 2 East walls.
.