Pics and report courtesy of Prof. Ron Roehl:
Doors are being hung and they look great. Showed some classroom doors and one outside door with the closer.
Siding is continuing ...
The electric panel is the control panel for the entire heating system.
The insulation around the various heat/cooling pipes needs to be sealed tightly. Painting and other processes are used.
Sprinkler system has heads like this throughout the building.
.
Many of the pictures are courtesy of Cheryl Meyer and retired Prof. Ron Roehl. You may also click on the slide show in order to access directly the Picasa album for additional features (e.g., seeing the pictures larger, ordering pictures for printing, etc.).
You may scroll down to the bottom of this blog page to see two different views of the live web cams focused on the building site!