Many of the pictures are courtesy of Cheryl Meyer and retired Prof. Ron Roehl. You may also click on the slide show in order to access directly the Picasa album for additional features (e.g., seeing the pictures larger, ordering pictures for printing, etc.).

You may scroll down to the bottom of this blog page to see two different views of the live web cams focused on the building site!

Thursday, April 30, 2009

Video: Update April 30

Full Video of the April 30 Update:
http://www.ilcpublicity.org/video/update04_30_09.wmv

Shingling and Walls

Last of the roof sections being shingled. Other side is finished.
Front walk concrete pad and part of concrete walkway
All outside walls insulated and some sheetrock up on the ceilings
Forms are mostly in for the circular concrete work to done in front of the Admin entrance. The flagpole with lights and the college name with lights will be part of this feature. It looks like one big slab but there will be cuts made in it to dress it up.
Hangers for the drop ceiling in the music room are being put in place.



.

Saturday, April 25, 2009

Circular Wall at Entrance; Stained Glass Windows

No inside pics today, but the walls are going up rapidly and the inside footprint is taking shape.
Dirt has been moved around outside and this morning a group of willing students helped move blocks so that Mr. Tom Beekman could build the front circular wall which will carry the name of the school in metal letters.
The wall will have a flag pole behind it and have a cap that can be sat upon if anyone so desires. It is a nicely textured stone face inside and outside.
Two neat pictures of one of the the windows made by Eileen McEnroe and Pastor Roehl of Bismarck. One has the Luther Seal and the other the School Seal. These were installed Thursday and Friday while Pastor Roehl was here for meetings.



.

Thursday, April 23, 2009

Stained Glass Window - ILC Seal

Just three pics of the one stained glass window at night.
The backlighting will improve when the permanent ones are in.



.

Video: Block of Entrance Circle Area



.

Wednesday, April 22, 2009

Video: Stained Glass Installation



.

Pouring Completed; Stained Glass Window

Some pics of the inside walls going up in Phase 2.
Last of the floors poured and finished.
You see a couple of walls up for the media rooms next to the library.
Entrance to the Admin section from the inside out.
Glass block windows in the music room.
One Stained Glass Window was put in today. This pic does not have the trim on yet. That will come tomorrow.



.

Tuesday, April 21, 2009

Concrete Poured for Phase Two

Library and Computer rooms preparation for, pouring, and troweling. Looks great and would make a great skating rink before the walls are put up.

There was new concrete floors poured this morning and you can see that it is still not set and finished. The picture is of the President's office area (future).

Windows are going in on the library area.

The high outside pic is of one of the windows that will have the stained glass behind it yet this week.



.

Saturday, April 18, 2009

Wrapped and Slab Ready to be Poured

Pics and report courtesy of Prof. Ron Roehl:

The building is wrapped and paper on the roof. I guess that means it is out of the weather.

Inside is completely prepared for the slab pouring which I believe will be Monday. Since these pictures the wire reinforcing mesh has been added to the base for the slab floor.

Fans are ready and the gas dryer is set up. The cement will have to be dollied in with some power driven cement carriers. Neat and not too difficult. It will be a lot to haul.

The pic with the top vent is the back side (East) of the building.



.

Friday, April 17, 2009

Roofers and Metal Studs

Pictures are courtesy of Prof. Ron Roehl:

Not a lot of update - Roofers on Wed., metal studs on the block walls, electricians putting in temporary work lights, and a Nebraska gal sitting on the base for the sign and the flagpole.

Some kind of fuzzy today.



.

Wednesday, April 15, 2009

Video: Pouring of Inside Concrete Slab



.

Last Dormer, Block Windows, Studs

Hats off to Prof. Ron Roehl for his continued reports and pictures:

Last small decorative dormer put in place.
The base for the semicircular sign is complete and being backfilled this morning.
Masons are putting in the glass block windows for the music room.
Trim or facing along the roof edge is finished around the building. Roofers can proceed to finish their part.
Bathroom wall studs are in place along with some others in the administration area.



.

Tuesday, April 14, 2009

Roofing and Blocking for Flag Pole Area

Most will recognize the circular structure from the architects original drawings.
Roofers are at work.
Carpenters are on the trim work (facia) all around.
Slab will come probably next week, then the inside walls.
Plenty siding to do so no one will stand around waiting.



.

Saturday, April 11, 2009

Flagpole Area Prep

Pics and report courtesy of Prof. Ron Roehl

Not much update but a few pics to show some progress.

The trench is for the circular wall and flagpole area. Needs a good foundation.

Roofers made a little headway.

Lots of wood in the rafters.

Some perspective pics.



.

Friday, April 10, 2009

Video: Bulldozing & Roof Sheeting



.

All Rafters Up

Pics and report by Prof. Ron Roehl

Just a few to catch you up on some of the progress.
All the rafters are up now.
The roof is on all of the building.
The roofers are on site and getting the shingling started.
The downspouts are being connected to the storm drains.
The area is being prepared for the slab in the library and computer rooms.
Also the base for the flag pole area is being readied.



.

Thursday, April 9, 2009

Video: Storm Sewer Lines



.

Video: Peaks of Administrative Section



.

Wednesday, April 8, 2009

Peaks on Administration Area

Just two pics to show the progress.

One is the side view of the office area. It is the far north section of phase 2.

The other is taken from the west side to show the two peak sections and the entry area to the business and administration area.

The slab will be poured hopefully early next week.

The crane will be packed up and out of here by tonight.



.

Monday, April 6, 2009

Video: Trusses & Roof Sheeting



.

Rafters Over Administration Area

Pics and report by Prof. Ron Roehl:

Trusses are going up on the last section. We will finally run out of trusses and that's good. Windy today so it was a little tougher setting the rafters.



.

Friday, April 3, 2009

Video: More Walls of Adminstrative Center



.

Closing in the Roof

Pics from Prof. Ron Roehl:

Working on walls for the interior and trying to close in the roof.
Weather is cool but good working weather.



.

Wednesday, April 1, 2009

Video: Walls of Administrative Section



.

Walls for the Administrative Offices

Progress on the walls of the office section of phase 2:



.