Pics and report courtesy of Prof. Ron Roehl:
The building is wrapped and paper on the roof. I guess that means it is out of the weather.
Inside is completely prepared for the slab pouring which I believe will be Monday. Since these pictures the wire reinforcing mesh has been added to the base for the slab floor.
Fans are ready and the gas dryer is set up. The cement will have to be dollied in with some power driven cement carriers. Neat and not too difficult. It will be a lot to haul.
The pic with the top vent is the back side (East) of the building.
.