Many of the pictures are courtesy of Cheryl Meyer and retired Prof. Ron Roehl. You may also click on the slide show in order to access directly the Picasa album for additional features (e.g., seeing the pictures larger, ordering pictures for printing, etc.).

You may scroll down to the bottom of this blog page to see two different views of the live web cams focused on the building site!

Saturday, April 18, 2009

Wrapped and Slab Ready to be Poured

Pics and report courtesy of Prof. Ron Roehl:

The building is wrapped and paper on the roof. I guess that means it is out of the weather.

Inside is completely prepared for the slab pouring which I believe will be Monday. Since these pictures the wire reinforcing mesh has been added to the base for the slab floor.

Fans are ready and the gas dryer is set up. The cement will have to be dollied in with some power driven cement carriers. Neat and not too difficult. It will be a lot to haul.

The pic with the top vent is the back side (East) of the building.



.

No comments: