Many of the pictures are courtesy of Cheryl Meyer and retired Prof. Ron Roehl. You may also click on the slide show in order to access directly the Picasa album for additional features (e.g., seeing the pictures larger, ordering pictures for printing, etc.).

You may scroll down to the bottom of this blog page to see two different views of the live web cams focused on the building site!

Wednesday, December 24, 2008

Christmas Eve Work

Pics from Prof. Ron Roehl who reports:

This is Christmas Eve morning and we have electricians, carpenters and roofers working at least to noon.

There are 2 pics of the roofers who have finished the cap on the southern end of the building. Also working to finished the connecting area roof with its cap.

Inside the electricians are working on the flexible conduit for the horizontal runs and rigid conduit for the vertical runs. Most boxes are in and waiting for conduit connections and the pulling of the wires.

The mechanical room (4 pics) is getting the finished wooden panel wall. It seemed like 3/4 inch plywood finished on one side. It gets only paint on these panels.

The other pics show the tubes where the geothermal tubing come in and also the connector for the geothermal lines to the various zones in the building. You can see that each of them has its own shutoff so control of the various zones will be quite easy.

I do not know when the workers will be back after Christmas.

Blessing to each of you as we are again amazed and comforted by the Christmas story.