Pics from Prof. Ron Roehl who writes:
Back side of this roof is done and they are at work on the front of the connecting area between the sets of two classrooms.
The windows are mostly all in on the phase one section.
The inside is being heated with the burner you see. You have a pic from the inside and from the outside.
The inside outside walls are all batted and ready for the wall covering. The ceiling has the vapor barrier up and ready for the lid of sheetrock.
Looking better every day.
.

You may scroll down to the bottom of this blog page to see two different views of the live web cams focused on the building site!