Pics courtesy of Prof. Ron Roehl who reports:
Roofers are here and going full blast. The South slope is papered and should be pretty well all shingled by tomorrow depending on the weather. There is some paper on the back side but it looks like they will paper as they go contrary to one of the earlier reports.
The inside pictures are dark but you can see that the plastic vapor barrier is going up in preparation for the sheetrock lid. Some insulation has arrived and the men are putting some in the wall areas.
It is still very slippery inside with the real smooth concrete floor and the snow still not melted on that smooth floor. It helped that a group of students got in there last Saturday and got a lot of the snow down off the rafters so that will not bother the workers.
The concert is soon upon us and the students will be gone. Remember the concert is at Messiah Church (Friday at 7:30 pm).
.
Many of the pictures are courtesy of Cheryl Meyer and retired Prof. Ron Roehl. You may also click on the slide show in order to access directly the Picasa album for additional features (e.g., seeing the pictures larger, ordering pictures for printing, etc.).
You may scroll down to the bottom of this blog page to see two different views of the live web cams focused on the building site!
Wednesday, December 17, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment